Photographs and Off-line Digital Images |
H 92002 PO |
View from N side of Eye Water showing semi-demolished bridge pier from original bridge. |
c. 1948 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92018 PO |
View of partially reconstructed temporary bridge from NE. Possibly view os Brockholes Wood. |
c. 1948 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92050 PO |
View of bridge from N showing work underway on rebuilt central pier after 1948 flood damage. |
31/5/1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92012 PO |
View showing reconstruction work underway with steel shoring and temporary piers in place. |
c. 1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92013 PO |
View of bridge reconstruction underway with steel girders in place and temporary peirs. |
c. 1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92017 PO |
View from NE side of Eye Water showing remains of bridge following the flood. |
c. 1948 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92048 PO |
View of bridge from S showing almost completed work underway on rebuilt central pier after 1948 flood damage. |
9/6/1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92049 PO |
View from bridge deck from S showing almost completed work underway on rebuilt central pier after 1948 flood damage. |
9/6/1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92051 PO |
View from W side of Eye Water showing almost completed work underway on rebuilt central pier after 1948 flood damage. |
9/6/1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92052 PO |
View from W side of Eye Water showing almost completed river control work on N side of piers after 1948 flood damage. |
9/6/1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92010 PO |
View of bridge reconstruction underway with only the temporary piers in place and one steel girder being placed in position. |
c. 1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92009 PO |
View of bridge reconstruction underway before the temporary piers have been put in in place and preliminary work underway on piers. |
c. 1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92011 PO |
View of bridge reconstruction underway before the temporary piers have been put in in place and preliminary work underway on piers. |
c. 1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92003 PO |
View from N side of Eye Water showing completed bridge. |
c. 30/6/1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92004 PO |
View from N side of Eye Water showing completed bridge. |
c. 30/6/1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92006 PO |
View f rom SW showing work underway on shoring embankment at coastal section. |
c. 1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92005 PO |
View from SE at track level showing work underway on shoring embankment at coastal section. |
c. 1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92024 PO |
View from NE side of Eye Water showing remains of stone culvert following the flood. Preliminary clearing work is underway. |
c. 1948 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92023 PO |
View showing farmhouse and cart shed, location unkown. |
c. 1948 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92007 PO |
View showing partially completed bridge with new abutments and temporary bridge and piers. |
c. 9/6/1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92008 PO |
View showing partially completed bridge with new abutments and temporary bridge and piers. The down train(Edinburgh bound) is showgenn crossing . The locomotive is LNER/BR class A4 locomotive number 60005 'Sir Charles Newton'. |
c. 1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92019 PO |
View from N showing temporary bridge and piers in place. |
c. 1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92014 PO |
View from NE showing temporary bridge before replacement girders put in place. |
c. 1949 |
Item Level |
|
Photographs and Off-line Digital Images |
H 92015 PO |
View from N before the removal of old track with cranes and earth moving equipment. Part of stone abutment of old bridge is also visible. |
c. 1949 |
Item Level |