Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Scheduled Maintenance


Please be advised that this website will undergo scheduled maintenance on the following dates: •

Tuesday 3rd December 11:00-15:00

During these times, some services may be temporarily unavailable. We apologise for any inconvenience this may cause.

 

 

 

Detail view showing concrete pouring operation at base of bridge pier with steel shoring in place.

H 92039 PO

Description Detail view showing concrete pouring operation at base of bridge pier with steel shoring in place.

Date c. 1949

Collection General Collection

Catalogue Number H 92039 PO

Category Photographs and Off-line Digital Images

Accession Number 2007/78

External Reference B3

Permalink http://canmore.org.uk/collection/1065708

Collection Hierarchy - Item Level

Collection Level (551 359) General Collection

Group Level (551 359/3) PHOTOGRAPHS

>> Sub-Group Level (551 359/3/37) Railway bridges

>>> Item Level (H 92039 PO) Detail view showing concrete pouring operation at base of bridge pier with steel shoring in place.

People and Organisations

Events

Attribution & Licence Summary

Attribution & Restricted Use Summary

Attribution: © RCAHMS

Licence Type: Limited

You may solely view this material on the Canmore Site. No other use is permitted.

Full Terms & Conditions and Licence details

MyCanmore Text Contributions